AccuRoof lent its support to the building of a purpose-built play room for the Scottish Children’s charity, Play Alloa. Part of SIG UK Exteriors, AccuRoof supplied roofing materials and technical support free of charge to Play Alloa’s #ourweebigbuild project.
After two decades of sterling work within Clackmannanshire providing play and social opportunities together with additional support for children and adults with disabilities, Play Alloa has finally moved into its very own premises.
The new building, which is in Broad Street Alloa, has a huge rear garden where three flatlets have been knocked through to create a flexible, flowing space including a large purpose built games room.
Chartered architect, Lawrie Orr of Alloa developed a generic specification for the 85m2 bonded, warm roof build up in a RAL 7015 finish and said that working with AccuRoof made the process very straightforward.
AccuRoof selected IKO’s Armourplan SG PVC membrane in slate grey (RAL 7015) as the fleece backed single ply is supplied in 2m widths which minimises hot welding on site without naked flames. The roof build up also comprises Recticel tissue faced insulation (mechanically fixed) and a PE VCL layer. AccuRoof also supplied standing seam profiles to create a water check, preventing wind-driven rain being blown off the roof and onto building users.
To comply with regulations, Design & Technology’s technical team checked local wind zones against wind uplift calculations (to meet BS EN 1991-1-1-4) and supplied wind load calculations plus COSHH and other data sheets. Design & Technology’s field technician will visit site to ensure that the roof has been installed correctly and offer contractor Stirling Roofing support if needs be.
Play Alloa’s Chairman, Bob Davis said: “My own 27 year old daughter Emily has been coming to Play Alloa practically all her life. These ‘Special Young People’ will really benefit from the new facilities not only at club meetings. The fully refurbished premises will also be available for parents and children to use for their own events and parties seven days a week. Many children with disabilities need the reassurance that stimulating, familiar surroundings provide. #ourweebigbuild project will provide exactly that!”
AccuRoof’s technical manager, Steve Cleminson said; “We made sure that the roof at Play Alloa’s #ourweebigbuild project fully complies with regulations. All our projects need to meet our #PerfectRoof guidelines.
Design & Technology has identified the challenges and ensures that a roof’s design meets a building’s requirements. Our eight steps follow the process from product selection and design expertise through to full guarantees and planned maintenance. This know-how is just part of the service that is provided absolutely free to customers.
Download the AccuRoof provides material for #ourweebigbuild charity project case study PDF