This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
Q9: Flat Roof Interfaces with Other Elements
As we’re working through the checklist we are beginning to identify a group of preferred waterproofing solutions, but one of the fundamental issues to consider is interfaces. Flat roofing will interface many different materials including
- External cladding
- Door thresholds
- Parapets
- Penetrations
How these are treated will relate to available upstand heights, insulation type and whether warm, cold or inverted roof. You will need to ensure that you will end up with the right details to get the warranty that your client requires, so list all the interfaces involved.
As well as understanding how the detail is to be constructed, it is important to consider the sequencing of works, i.e. which elements are installed first.
Thresholds are a classic example. We often come across situations where the doors have already been installed but the waterproofing has not yet started. The contractor is then left with the requirement to dress waterproofing under an already installed door threshold. This makes life very difficult with limited access. To waterproof around thresholds well is particularly important – it is one of the pinch points in a scheme, so you need the best possible access to provide the intricate detailing.

Be sure you have information about all the planned penetrations of the roof. Soil pipes, rooflights, PV related services, plant, all need identifying to ensure proper detailing and preparation. You want to avoid follow-on trades penetrating the waterproofing, which may invalidate guarantees and potentially cause future leaks. This is one reason why, for example, we recommend an engineered solution when installing solar PV.
Another reason to identify all the interfaces is to ensure that the materials that are connected are compatible with the waterproofing material to be specified. For example
- From a pitched roof discharging down onto a flat roof, bituminous sarking felt can be a problem for PVC membranes;
- Door thresholds with EPDM rubber sealing gaskets may be incompatible with single ply or some liquids;
- Parapet flashings and capping details using EPDM membranes or closers may be an issue;
- Water runoff from some materials, such as cedar cladding onto a zinc roof or copper cladding onto a single ply roof.
Make sure you check if the sealing around products such as rooflights have been tested in use with the waterproofing you will specify. If the bond fails you want to be clear whose responsibility it is, rather than be left holding the baby or a complicated dispute between different manufacturers.
Q10: Cost
Which systems will allow us to achieve all the above most cost efficiently?
There is a reason why we’ve put cost last in this section –all the above issues will ultimately dictate the build cost of your waterproofing solution. If we design everything and try and address the issues discussed previously, we’ll have a relatively fixed cost for what the system will cover, and there are unlikely to be any unforeseen design issues that weren’t known about during the design stage.
How does this relate to your budget? You need to understand whether the waterproofing solution is within the budget provided by the client. If yes, great, but if not, you now have ammunition to go back to your client to either increase your budget or to your provider to value engineer the solution, whilst keeping the parameters you have already identified.
Although not seen as a ‘sexy’ product to architects, flat roofing forms part of the envelope and its proper functioning is of critical importance to the success of any project. So whilst it might not be interesting or aesthetically pleasing, it’s a part of the project that can cause huge problems if it doesn’t work. For this reason, investment of time in the right, early decisions and money in the correct solution will save money in the long term, particularly when you consider the impact cost of a flat roof not performing.
Moving on to Installation
We’ve now come to the end of the factors that influence the design of your flat roof. Next we move on to issues which arise out of the installation .
Speak to our roofing specialists
Contact us for accurate, impartial advice
Take control of your roofing project from the very start.
Related posts
31 October 2018
Flat Roof Penetrations: Best Practice
Flat Roof Penetrations are a cause of weakness in many roofs - get them right! View some details showing best practice.
Read more25 January 2018
Flat Roof Insulation – The biggest cost
We spoke to Christa Coe, Specification Manager at AccuRoof, about insulation, why it is important, and some things to remember. When you’re…
Read more3 April 2014
Falls in Concrete Flat Roofs – is Tapered Insulation cheaper than Screed?
‘Cut to Falls’ is often the most expensive part of the roof system, and so we’re often asked how to make it…
Read more